Replacing or buying a new energy-saving air compressor in Singapore are no longer a concern, thanks to government support through the Energy Efficient Grant!
In line with Singapore Budget 2024 initiatives, the Energy Efficiency Grant (EEG) will undergo enhancements and expansions to cover additional sectors. Effective April 1, 2024, enterprises operating in Manufacturing (including Food Manufacturing), Food Services, and Retail sectors will gain access to the EEG. Subsequently, other sectors (Construction, Maritime, and Data Centers and their users) will be gradually included, by the end of 2024.
So, what is Energy Efficient Grant (EEG)?
Below are the two tiers of support under EEG:
*only applicable for companies in the Manufacturing sector.
Energy Efficient Grant (EEG) Eligibility:
*only applicable for companies in the Manufacturing sector.
For Compressed Air System category in EEG equipment, not every type of compressor will be approved. Please refer to the following technical requirements:
*Our Atlas Copco screw compressor belong to variable speed air compressor
BASE TIER
First, we will address the EEG (Base Tier). The application is available from April 1, 2024, until March 31, 2026. Companies will have up to 1 year from the approval date of their application to purchase and install the equipment and submit claims for reimbursement.
1. For Manufacturing (including Food Manufacturing) Companies
To apply for the EEG (Base), manufacturing companies will have to:
-
Email [email protected] to verify company’s eligibility and request for application documents.
-
Obtain quotations from the vendor.
-
Submit your application document to [email protected]
2. For Food Services and Retail Companies
iii. Submit an application on the BGP. Do note that companies will need to have a CorpPass account to transact on the BGP.
2. For Food Services and Retail Companies
- Claimant has purchased the equipment as approved in the application; and
- Claimant has deployed and installed the equipment; and
- Claimant has paid for the equipment in full; and
- Claimant has submitted all claim documentation including;
- Invoice
- Payment supporting documents which indicate grant applicant name, payee name, payment date, payment amount and approval status of transaction. Acceptable documents are bank statement, cheque and bank transfer screenshot.
- Delivery Order
- Images:
- Equipment being installed and used on site. Pictures should be clear to show the equipment and location where it is being used.
- Serial number of equipment (if applicable)
ADVANCE TIER
Next, you might be interested to know EEG Advanced Tier, which you might assume is an extension of the Base Tier or it’s for particular sector only. Well, it’s was designed to acknowledge that companies in specific sectors might require additional investment beyond what’s covered in the EEG (Base) to procure energy-efficient equipment relevant to their operations
WHAT IS THE DURATION FOR THIS TIER?
The application is available from April 1, 2024, until March 31, 2026. Companies will have up to 1 year from the approval date of their application to purchase and install the equipment and submit claims for reimbursement.
- Claimant has purchased the equipment as approved in the application; and
- Claimant has deployed and installed the equipment; and
- Claimant has paid for the equipment in full; and
- Claimant has submitted all claim documentation including;
- Equipment being installed and used on site. Pictures should be clear to show the equipment and location where it is being used.
- Serial number of equipment (if applicable)
With EEG assistance, acquiring energy-efficient equipment for your business is no longer a challenge. You may refer to the list of equipment for specific sector. Our Atlas Copco screw compressors, which are one of the VSD type, are included in this list. Additionally, we offer value-added service by providing a complimentary energy audit report for consultation, with no obligation in Singapore.
Why Buy from Winston Engineering? Get a FREE Energy Audit Before Replacing Your Conventional Fixed Speed Compressor with a VSD Compressor – Ensure Peace of Mind with Our Comprehensive Audit Report. Achieve Significant Carbon Reduction and Prevent Excess Carbon Tax While Saving on Energy Costs.
Project Reference under Government grant:
Location: Central Region, Singapore
Model: GA22VSD+
Year: 2024
FAQ
-
How to verify SSIC Code?
- Is it possible to deploy equipment to a residential address?
- What happens if the grant cap is fully utilized?
- How many EEG (Base) grants can a company apply for?
- What is the difference between EEG (Base) and the EEG (Advanced)?
- Support levels under the EEG (Base) based on the company’s size or
- The equipment’s expected lifetime carbon abatement. Support is capped at $350,000 across all of a company’s EEG (Base) and EEG (Advanced) applications.
- Can I apply for EEG (Advanced) after applying for EEG (Base)?
8. How is the grant support for EEG being calculated?
Refers to the total amount of carbon emissions reduced over the entire lifespan of the equipment or product. It encompasses the emissions saved from the time the equipment is put into use until the end of its operational life. So, essentially, it refers to the cumulative carbon reduction achieved throughout the product’s lifetime.