{"id":250101,"date":"2026-05-04T14:19:31","date_gmt":"2026-05-04T06:19:31","guid":{"rendered":"https:\/\/winstonengineering.com\/my\/?p=250101"},"modified":"2026-05-15T11:08:17","modified_gmt":"2026-05-15T03:08:17","slug":"successful-factory-acceptance-test-at-taiko-ssr-3-lobe-roots-blower-factory","status":"publish","type":"post","link":"https:\/\/winstonengineering.com\/my\/successful-factory-acceptance-test-at-taiko-ssr-3-lobe-roots-blower-factory\/","title":{"rendered":"Successful Factory Acceptance Test at Taiko SSR 3-Lobe Roots Blower Factory"},"content":{"rendered":"<p data-start=\"83\" data-end=\"296\">Winston Engineering recently completed a successful Factory Acceptance Test (FAT) at the <a href=\"https:\/\/winstonengineering.com\/my\/product\/3-lobes-roots-type-blowervacuum-pump\/\">Taiko SSR 3-Lobe Roots Blower<\/a> manufacturing facility, together with our valued customer and Malaysia\u2019s sewerage authority.<\/p>\n<div class=\"et_pb_slider et_pb_slider_fullwidth_off et_pb_gallery_post_type\">\n\t\t\t\t<div class=\"et_pb_slides\">\n\t\t\t\t\t<div class=\"et_pb_slide\" style=\"background: url(https:\/\/winstonengineering.com\/my\/wp-content\/uploads\/2026\/05\/Photo2.jpeg);\"><\/div><div class=\"et_pb_slide\" style=\"background: url(https:\/\/winstonengineering.com\/my\/wp-content\/uploads\/2026\/05\/Photo3.jpeg);\"><\/div><div class=\"et_pb_slide\" style=\"background: url(https:\/\/winstonengineering.com\/my\/wp-content\/uploads\/2026\/05\/Photo5.jpeg);\"><\/div><div class=\"et_pb_slide\" style=\"background: url(https:\/\/winstonengineering.com\/my\/wp-content\/uploads\/2026\/05\/Photo4.jpeg);\"><\/div><div class=\"et_pb_slide\" style=\"background: url(https:\/\/winstonengineering.com\/my\/wp-content\/uploads\/2026\/05\/Photo6.jpeg);\"><\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n<p data-start=\"298\" data-end=\"670\">The session served as a critical milestone in validating the equipment\u2019s performance, ensuring compliance with required specifications, and confirming overall product reliability prior to deployment. Our team worked closely with all parties involved to conduct thorough inspections and performance testing, reinforcing confidence in the system\u2019s readiness for operation.<\/p>\n<p data-start=\"672\" data-end=\"848\">This collaborative effort reflects our ongoing commitment to delivering high-quality, dependable engineering solutions that meet industry standards and customer expectations.<\/p>\n<p data-start=\"850\" data-end=\"895\"><strong data-start=\"850\" data-end=\"893\">Quality assured. Reliability delivered.<\/strong><\/p>\n<p data-start=\"897\" data-end=\"1031\" data-is-last-node=\"\" data-is-only-node=\"\">At Winston Engineering, we continue to move forward in providing solutions in action, built on trust, performance, and long-term value.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Winston Engineering recently completed a successful Factory Acceptance Test (FAT) at the Taiko SSR 3-Lobe Roots Blower manufacturing facility, together with our valued customer and Malaysia\u2019s sewerage authority. The session served as a critical milestone in validating the equipment\u2019s performance, ensuring compliance with required specifications, and confirming overall product reliability prior to deployment. Our team [&hellip;]<\/p>\n","protected":false},"author":26,"featured_media":250102,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","footnotes":""},"categories":[525],"tags":[],"class_list":["post-250101","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"acf":[],"_links":{"self":[{"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/posts\/250101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/comments?post=250101"}],"version-history":[{"count":10,"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/posts\/250101\/revisions"}],"predecessor-version":[{"id":250165,"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/posts\/250101\/revisions\/250165"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/media\/250102"}],"wp:attachment":[{"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/media?parent=250101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/categories?post=250101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/winstonengineering.com\/my\/wp-json\/wp\/v2\/tags?post=250101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}